Caledonia was contracted to conduct the prefabrication and installation of insulated compressor enclosures. A team of supervisors and 20 x sheet metal workers were mobilised in June 2024 to work on the project with a 3:1 roster. Our team onsite were originally contracted for phase 1 specifically; however, our contract was extended to phase 2 on construction, thanks to the continuous efforts of our team. The first phase of this venture required 6 x compressor skids and the scope of work for each involved prefabricating and insulating all walls, doors, hatches, and rooves. This had to be completed prior to lifting the compressors into position, as per the specifications and installation methodologies.

Project Highlights:

  • 1st project in the hydrogen sector
  • Excellent feedback on teams, management, and finished product
  • Awarded further works on the project
  • Opportunity to tender other construction sites pending