Doric Group engaged Caledonia to build a heavy-duty gantry on Hay St, Perth for the City of Perth Library Project.
Due to the size of the gantry, it being free-standing and the fact it had to take the weight of three portable cabins, 12 one tonne counter-weights were installed along each 1.8m bay of the scaffold. The scaffold was engineered and designed by our good friends at Scaftec.