Caledonia was engaged by Evolution Commercial to provide a fully encapsulated scaffold to allow for the repainting of a 51m yacht.
Due to the tides the boat needs to be scaffolded, repainted and the scaffold taken down all within an 8 week period so it can be put back in the water.